Yangshan Tunnel on Section III of the Qu-Song Segment of the Second Phase of the Quzhou-Lishui Railway Successfully Exceeds 3,160 Meters in Excavation

2026-05-13 3623 0人评论

Recently, the tunneling of the Yangshan Tunnel in Section III of the Qusong segment of the second phase of the Quzhou-Lishui Railway successfully surpassed 3,160 meters, marking important phased progress in the railway's construction.


The starting point of Section III of the Qusong segment of the Quzhou-Lishui Railway is located in Yaoshan Village, Donghua Subdistrict, Longyou County, and the endpoint lies outside Pailing Village, Beijie Town, Suichang County, Lishui City. The main line has a total length of 27.512 kilometers and a design speed of 200 km/h (with 250 km/h reserved). It mainly includes 10 subgrade sections, 16 bridges, and 8 tunnels.

As a key section of the second phase of the Quzhou-Lishui Railway, this section connects important nodes between Quzhou and Lishui, and its construction progress is directly related to achieving the goal of opening the entire line to traffic.


评论 (0)

TOP