Announcement of Bidding for Main Works Construction Contracts 1-6 of the Reconstruction and Expansion Project of the He'ao–Shenzhen Airport Section of the Shenyang–Haikou National Expressway
I. Industry: Highway
II. Tenderee: Shenzhen Expressway Group Co., Ltd.
III. Total planned project investment:47,500 million yuan
IV. Project overview: The reconstruction and expansion project of the He'ao–Shenzhen Airport section of the Shenyang–Haikou Expressway belongs to the Shenzhen section of the G15 Shenhai Expressway and is located in the central area of Shenzhen. It is the east-west central traffic axis of the Guangdong-Hong Kong-Macao Greater Bay Area. The project starts at the He'ao Interchange in Longgang District, Shenzhen, connecting with the reconstruction and expansion project of the Shenzhen section of the Huiyan Expressway, and runs from east to west along the existing Jihe Expressway, ending at the connection with the side link of the Shenzhen-Zhongshan Link. The route length is approximately 41.4 km, passing through Shenzhen (Longgang District, Longhua District, Bao'an District) and Dongguan City.
V. Lot division:
Contract Lot 1:Within the scope of the ground level from the starting chainage to DK8+500, the elevated level left carriageway ZK4+500–ZK8+537.455 and right carriageway YK3+986.939–YK8+611.8 of the He'ao–Shenzhen Airport section of the Shenyang–Haikou National Expressway: (1) Ground level: subgrade, bridges and culverts, power transformation and distribution, and high-mast lighting in interchange areas, etc.; demolition and reconstruction of old bridges, repair and strengthening of old bridges, reconstruction of concrete bridge deck pavement, jacking, guardrail modification, widening (including bearing replacement); maintenance work area; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (2) Elevated level: subgrade, bridges and culverts; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (3) Common to ground and elevated levels: traffic diversion works; road relocation, river relocation, canal relocation; micro-topography improvement in interchange areas; procurement and installation of bridge anti-fall nets, anti-throwing nets and steel guardrails, etc.; isolation fences; decorative panels for pile-sheet walls, retaining walls, etc. (excluding coating); bridge approach slabs, concrete wing walls; drainage works; new construction and renovation of supporting ancillary facilities such as ramp station management buildings; relocation of power, communication, gas, water supply and drainage, lighting, monitoring and other pipelines; relocation of existing road power supply and distribution, relocation of signs and markings, relocation of landscaping; smart construction; environmental protection works (excluding the portion above the foundation of sound barriers); monitoring and measurement of structures such as bridges, tunnels (passages), high slopes, high fills and deep foundation pits; monitoring, measurement and protection of surrounding structures such as highways, railways, subways, reservoirs, river channels, power towers, gas, water supply pipes and buildings.Estimated contract value: 3,770 million yuan.
Contract Lot 2:Within the scope of ground level DK8+500–DK15+990, elevated level left carriageway ZK8+537.455–ZK16+026 and right carriageway YK8+611.8–YK15+950 of the He'ao–Shenzhen Airport section of the Shenyang–Haikou National Expressway (excluding railway-related works): (1) Ground level: subgrade, bridges and culverts, power transformation and distribution, and high-mast lighting in interchange areas, etc.; demolition and reconstruction of old bridges, repair and strengthening of old bridges, reconstruction of concrete bridge deck pavement, jacking, guardrail modification, widening (including bearing replacement); maintenance work area; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (2) Elevated level: subgrade, bridges and culverts; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (3) Common to ground and elevated levels: traffic diversion works; road relocation, river relocation, canal relocation; micro-topography improvement in interchange areas; procurement and installation of bridge anti-fall nets, anti-throwing nets and steel guardrails, etc.; isolation fences; decorative panels for pile-sheet walls, retaining walls, etc. (excluding coating); bridge approach slabs, concrete wing walls; pavement base in tunnels (passages), tunnel decoration and fire protection, etc.; drainage works; new construction and renovation of supporting ancillary facilities such as ramp station management buildings; relocation of power, communication, gas, water supply and drainage, lighting, monitoring and other pipelines; relocation of existing road power supply and distribution, relocation of signs and markings, relocation of landscaping; smart construction; environmental protection works; monitoring and measurement of structures such as bridges, tunnels (passages), high slopes, high fills and deep foundation pits; monitoring, measurement and protection of surrounding structures such as highways, railways and subways.Estimated contract value: 3,700 million yuan.
Contract Lot 3:Within the scope of ground level DK15+990–DK21+100, elevated level left carriageway ZK16+026–ZK20+907.1 and right carriageway YK15+950–YK21+043.1 of the He'ao–Shenzhen Airport section of the Shenyang–Haikou National Expressway: (1) Ground level: subgrade, bridges and culverts, tunnels, power transformation and distribution, and high-mast lighting in interchange areas, etc.; demolition and reconstruction of old bridges, repair and strengthening of old bridges, reconstruction of concrete bridge deck pavement, jacking, guardrail modification, widening (including bearing replacement); maintenance work area; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (2) Elevated level: subgrade, bridges and culverts, tunnels; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (3) Common to ground and elevated levels: traffic diversion works; road relocation, river relocation, canal relocation; micro-topography improvement in interchange areas; procurement and installation of bridge anti-fall nets, anti-throwing nets and steel guardrails, etc.; isolation fences; decorative panels for pile-sheet walls, retaining walls, etc. (excluding coating); bridge approach slabs, concrete wing walls; pavement base in tunnels (passages), tunnel decoration and fire protection, etc.; drainage works; new construction and renovation of supporting ancillary facilities such as ramp station management buildings; relocation of power, communication, gas, water supply and drainage, lighting, monitoring and other pipelines; relocation of existing road power supply and distribution, relocation of signs and markings, relocation of landscaping; smart construction; environmental protection works; monitoring and measurement of structures such as bridges, tunnels (passages), high slopes, high fills and deep foundation pits; monitoring, measurement and protection of surrounding structures such as highways, railways and subways.Estimated contract value: 3,450 million yuan.
Contract Lot 4:Within the scope of ground level DK21+100–DK26+300, elevated level left carriageway ZK20+907.1–ZK26+270.1 and right carriageway YK21+043.1–YK26+315.1 of the He'ao–Shenzhen Airport section of the Shenyang–Haikou National Expressway: (1) Ground level: subgrade, bridges and culverts, power transformation and distribution, and high-mast lighting in interchange areas, etc.; demolition and reconstruction of old bridges, repair and strengthening of old bridges, reconstruction of concrete bridge deck pavement, jacking, guardrail modification, widening (including bearing replacement); maintenance work area; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (2) Elevated level: subgrade, bridges and culverts; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (3) Common to ground and elevated levels: traffic diversion works; road relocation, river relocation, canal relocation; micro-topography improvement in interchange areas; procurement and installation of bridge anti-fall nets, anti-throwing nets and steel guardrails, etc.; isolation fences; decorative panels for pile-sheet walls, retaining walls, etc. (excluding coating); bridge approach slabs, concrete wing walls; drainage works; new construction and renovation of supporting ancillary facilities such as ramp station management buildings; relocation of power, communication, gas, water supply and drainage, lighting, monitoring and other pipelines; relocation of existing road power supply and distribution, relocation of signs and markings, relocation of landscaping; smart construction; environmental protection works; monitoring and measurement of structures such as bridges, tunnels (passages), high slopes, high fills and deep foundation pits; monitoring, measurement and protection of surrounding structures such as highways, railways and subways.Estimated contract value: 3,400 million yuan.
Contract Lot 5:Within the scope of ground level DK26+300–DK31+720, elevated level left carriageway ZK26+270.1–ZK31+655.6 and right carriageway YK26+315.1–YK31+724.5 of the He'ao–Shenzhen Airport section of the Shenyang–Haikou National Expressway: (1) Ground level: subgrade, bridges and culverts, tunnels, power transformation and distribution, and high-mast lighting in interchange areas, etc.; demolition and reconstruction of old bridges, repair and strengthening of old bridges, reconstruction of concrete bridge deck pavement, jacking, guardrail modification, widening; maintenance work area; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (2) Elevated level: subgrade, bridges and culverts; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works; installation of steel guardrails. (3) Common to ground and elevated levels: traffic diversion works; road relocation, river relocation, canal relocation; micro-topography improvement in interchange areas; procurement and installation of bridge anti-fall nets, anti-throwing nets and steel guardrails, etc.; isolation fences; decorative panels for pile-sheet walls, retaining walls, etc. (excluding coating); bridge approach slabs, concrete wing walls; pavement base in tunnels (passages), tunnel decoration and fire protection, etc.; drainage works; new construction and renovation of supporting ancillary facilities such as ramp station management buildings; relocation of power, communication, gas, water supply and drainage, lighting, monitoring and other pipelines; relocation of existing road power supply and distribution, relocation of signs and markings, relocation of landscaping; smart construction; environmental protection works; monitoring and measurement of structures such as bridges, tunnels (passages), high slopes, high fills and deep foundation pits; monitoring, measurement and protection of surrounding structures such as highways, railways and subways.Estimated contract value: 4,010 million yuan.
Contract Lot 6:Within the scope of ground level DK31+720–project end point, elevated level left carriageway ZK31+655.6–project end point and right carriageway YK31+724.5–project end point of the He'ao–Shenzhen Airport section of the Shenyang–Haikou National Expressway (excluding railway-related works): (1) Ground level: subgrade, bridges and culverts, power transformation and distribution, and high-mast lighting in interchange areas, etc.; demolition and reconstruction of old bridges, repair and strengthening of old bridges, reconstruction of concrete bridge deck pavement, jacking, guardrail modification, widening; maintenance work area; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works. (2) Elevated level: subgrade, bridges and culverts; reserved embedment for mechanical and electrical, traffic safety, environmental protection and other works; installation of steel guardrails. (3) Common to ground and elevated levels: traffic diversion works; road relocation, river relocation, canal relocation; micro-topography improvement in interchange areas; procurement and installation of bridge anti-fall nets, anti-throwing nets and steel guardrails, etc.; isolation fences; decorative panels for pile-sheet walls, retaining walls, etc. (excluding coating); bridge approach slabs, concrete wing walls; pavement base in tunnels (passages), tunnel decoration and fire protection, etc.; drainage works; new construction and renovation of supporting ancillary facilities such as ramp station management buildings; relocation of power, communication, gas, water supply and drainage, lighting, monitoring and other pipelines; relocation of existing road power supply and distribution, relocation of signs and markings, relocation of landscaping; smart construction; environmental protection works; monitoring and measurement of structures such as bridges, tunnels (passages), high slopes, high fills and deep foundation pits; monitoring, measurement and protection of surrounding structures such as highways, railways and subways.Estimated contract value: 4,400 million yuan.
The above works shall be subject to the bill of quantities and construction drawing design documents.
VI. Obtaining of bidding documents:Obtained online
Announcement release date: November 23, 2023
Deadline for submission of documents: 2023-12-13 18:00
Source: Shenzhen Construction Engineering Trading Service Network
Link:
https://www.szjsjy.com.cn:8001/jyw/jyw/zbGongGao_View.do?ggguid=2c9e8ac28b8fd176018bcd58cd563d6e#zbgk
Announcement of Bidding for EPC General Contracting of the 100MW Manlai Laozhai and 150MW Manhong Tea-Photovoltaic Complementary Power Generation Projects in Menghai County
I. Industry: Power engineering
II. Tenderee: Yunnan Lvneng New Energy Development Co., Ltd.
III. Total project investment: 1,329.55 million yuan; the static investment of the Manlai project is 528.88 million yuan, and the static investment of the Manhong project is 800.67 million yuan.
IV. Project overview:
Construction location: the Manlai Laozhai project is located in Man'en Village, Menghai County, and the Manhong project is located in Manhelong Village, Menghai County.
Project scale: This project consists of two individual projects. The Menghai County Manlai Laozhai 100MW Tea-Photovoltaic Complementary Power Generation Project (hereinafter referred to as the "Manlai Laozhai Project") and the Menghai County Manhong 150MW Tea-Photovoltaic Complementary Power Generation Project (hereinafter referred to as the "Manhong Project"). The specific overview of each individual project is as follows:
(1) The rated capacity of the Manlai Laozhai Project is 100MW, and the installed capacity is 1,259,825 MWp. According to the construction scale and site location of this photovoltaic power generation project, as well as the current status and planning of the power grid, it is proposed to build a new 220kV booster station as part of the photovoltaic power station project, with the main transformer capacity selected as 150MVA, and to transmit power to the 220kV Daixiang Substation (tentative) via a 220kV line. The system connection scheme shall ultimately be subject to the approval opinion of the power grid company.
(2) The rated capacity of the Manhong Project is 150MW, and the installed capacity is 1,887,725 MWp. It will be connected to the 220kV Daixiang Substation (tentative) via one 220kV overhead line. The system connection scheme shall ultimately be subject to the approval opinion of the power grid company.
V. Lot division: This project has only one lot, i.e., the two individual projects are awarded as one bid package.
VI. Planned construction period: The planned construction period of the Manlai Laozhai Project is 6 months, and that of the Manhong Project is 8 months. The specific commencement date of each individual project shall be subject to the commencement notice of the supervisor. The time for preparation and approval of special topic reports is not included in the total construction period.
VII. Obtaining of bidding documents:
All interested bidders are requested to log in to the National Public Resource Trading Platform (Yunnan Province) Yunnan Provincial Public Resource Trading Information Network (website: https://ggzy.yn.gov.cn/#/homePage) from 10:00 on November 23, 2023 to 23:59 on November 30, 2023, select "Xishuangbanna Prefecture", find the lot of the project to bid for, and register online and obtain the electronic bidding documents (format *.BZBJ) with an enterprise digital certificate (CA). Enterprises that have not obtained an enterprise digital certificate (CA) need to apply for an enterprise digital certificate (CA) in accordance with the electronic authentication requirements of Yunnan Provincial Public Resource Trading, and after completing registration and approval on the National Public Resource Trading Platform (Yunnan Province) Yunnan Provincial Public Resource Trading Information Network (website: https://ggzy.yn.gov.cn/#/homePage) by selecting "Xishuangbanna Prefecture", they can obtain the electronic bidding documents. This is the only way to obtain the bidding documents.
Announcement release date: 2023-11-23
Deadline for submission of documents: 9:00 on December 14, 2023
Place for submission of bidding documents: Upload online. Bidders must log in to the National Public Resource Trading Platform (Yunnan Province) Yunnan Provincial Public Resource Trading Information Network (https://ggzy.yn.gov.cn/#/homePage) before the bidding deadline.
Source: Yunnan Provincial Public Resource Trading Information Network
Link:
https://ggzy.yn.gov.cn/tradeHall/tradeDetail?guid=33e48d4b-0834-452f-a1b6-147527672195&colCode=1&rowCode=%E6%8B%9B%E6%A0%87%E5%85%AC%E5%91%8A&from=jiaoYi
[Construction Case] Xitan Technology XPG-65 High-Pressure Jet Grouting Drilling Rig in Fuzhou Substation Project Construction
下一篇President of Uzbekistan Conducts On-Site Inspection of Taixin Equipment Construction Project
2026-10-30 15 0
2026-10-29 11 0

2024-10-08 13424 0

2024-09-30 13143 0
评论 (0)